Home> Products> Forged Metal Core> Forged Metal Iron Core for Rubber Track/Crawler
Forged Metal Iron Core for Rubber Track/Crawler
Forged Metal Iron Core for Rubber Track/Crawler
Forged Metal Iron Core for Rubber Track/Crawler
Forged Metal Iron Core for Rubber Track/Crawler
Forged Metal Iron Core for Rubber Track/Crawler
Forged Metal Iron Core for Rubber Track/Crawler
Forged Metal Iron Core for Rubber Track/Crawler
Forged Metal Iron Core for Rubber Track/Crawler

Forged Metal Iron Core for Rubber Track/Crawler

Get Latest Price
Payment Type:L/C,T/T
Incoterm:FOB,CFR,CIF
Min. Order:1 Piece/Pieces
Transportation:Ocean,Land,Air,Express
Product Attributes

MaterialSteel

OriginChina

Surface TreatmentSand Blasting

Transport PackageWooden Case

ApplicationMachinery Parts

Processing ObjectMetal

Molding StyleForging

Forging Tolerance+/-0.5mm

Heat TreatmentQuenching And Tempering

CertificationRoHS, ISO 9001:2000, ISO 9001:2008

StandardPer Your Request

TrademarkLIANGGONG

HS Code7326191000

Molding TechnicsDie Forging

Model NO.as per your request

SpecificationISO9001: 2008; SGS; ISO/TS16949

Production Capacity20000 Ton/Year

Packaging & Delivery
Selling Units : Piece/Pieces
Product Description

Basic Info.

Model NO.:as per your request
Surface Treatment:Sand Blasting
Forging Tolerance:+/-0.5mm
Standard:Per Your Request
Certification:RoHS, ISO 9001:2000, ISO 9001:2008
Transport Package:Wooden Case
Specification:ISO9001: 2008; SGS; ISO/TS16949
Trademark:LIANGGONG
Origin:China
HS Code:7326191000
Production Capacity:20000 Ton/Year

Product Description


We can manufacture a wide variety of metal cores for rubber track,and metal cores are essential spare parts in rubber track production.Now our metal core have been sold to many countries such as Thailand,Japan,USA and have been warmly welcomed by them,below is our products information:

1,Main Material: carbons steel 45# and alloy steel 40Cr or some other materials which customer requested.

2,Heat Treatment:HRC42-46 or some other hardness which customer requested.

3,Surface treatment:Shot Blasting.

4,Producttion Equipment:300Ton,400Ton,630Ton,1000Ton,1600Ton,2500Ton Press.

5,Product Weight:0.1kg-20kg

6,Models: From LG100*72 to LG 800*150



FAQ:  

1. Are you a genuine manufacturer?Yes, all products showed in our website are produced in our ISO9001:2015 certified factory; We are also a company registered by China Customs with the right to export and import.  

2. I want to keep our design in confidence; can we sign NDA?Sure, to protect customers' profit is our obligatory responsibility, signed NDA would be valid to both of us.. 

3. What should I offer to get your quotation?Please offer us your detailed information for the product, such as drawings with 2D/3D by software Pro/E, Auto CAD, SolidWorks, UG etc; as well as materials, surface treatment, quantity, package. Any special requirements should be highlighted especially for tolerance.  

4.How long does it take to receive samples?
20 working days,the lead time is the general production period and does not include the transportation time.
we can supply free samples with less quantity,but customers need to pay shipping cost.

5.How long is the manufacturing lead time?
Mass Production:30-45 working days after sample approval by yours.The lead time is the general production period without the transportation time.
We could make some special production arrangement effectively if customer has urgent need.

6.How long does it take to ship goods from China by sea?
It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container within 6 to 7 weeks.It takes about 2 weeks to east coast and 3 weeks to west coast US ports.All sea goods are shipped from Ningbo Port.

7.How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.

8.What are the payment terms?
Payment terms are negotiable and will improve for long term customers.During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.Production orders can be negotiable.We prefer 30% deposit and the balance by T/T before sails.But sometimes T/T15 days after sails would also acceptable.

9.New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept.To ensure the developing schedule---Design mould, fixture and gauge and making them in our factory---mould.fixture and gauge making---producing samples---approved from customer-purchasing material-forging-heat treatment-shot blasting-machining-Inspection-package---delievry


10.Which countries do you export to?
Now mainly export to U.S.A, Germany, France, Italy, UK, Brazil, Swedish, Japan, Korea, Middle east of Asia, Thailand and so on.

11.Can we visit the factory to conduct an audit?
Yes, you are welcome to visit our factory.

12.How to handle the complains?
--If happen any complaints after delivery,please just show us photos and detail compliants points, we will check with the production department and QC department Immediately and give you best solving solution which agreed by both of us,moreover we will bear all the cost (including shipping cost).


Forged Metal Iron Core for Rubber Track/Crawler

 
 

Forged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/CrawlerForged Metal Iron Core for Rubber Track/Crawler
Home> Products> Forged Metal Core> Forged Metal Iron Core for Rubber Track/Crawler
Send Inquiry
*
*

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send